The Ballona Wetlands Ecological Reserve Baseline Assessment Program 2009-2010 Final Report

In September 2010, the SMBRC completed the first year of surveys at the Ballona Wetlands Ecological Reserve (BWER). The comprehensive surveys were developed in partnership with the California Department of Fish and Game and the California State Coastal Conservancy to assess the condition of the BWER and inform the state’s wetlands restoration planning. This document… Continue reading The Ballona Wetlands Ecological Reserve Baseline Assessment Program 2009-2010 Final Report

Malibu Lagoon Restoration and Enhancement Project Comprehensive Monitoring Report – March 2013

This Comprehensive Monitoring Report describes methods and provides data accumulated since the last series of reports, including pre-restoration monitoring surveys, during-construction surveys, and the first series of initial post-restoration baseline monitoring and surveys. The goal of this 2014 document is to report the during-construction and post-restoration conditions of the Malibu Lagoon Restoration and Enhancement Project… Continue reading Malibu Lagoon Restoration and Enhancement Project Comprehensive Monitoring Report – March 2013

Technical Memorandum: Ballona Wetlands Ecological Reserve Vegetation Alliance and Habitat Crosswalk

This document serves as a reference for a vegetation alliance and association to habitat crosswalk at an impacted and degraded salt marsh system in Los Angeles County. Surveys were conducted at the Ballona Wetlands Ecological Reserve (BWER) by The Bay Foundation (I. Medel and team) from May – October 2013 in accordance with methods created… Continue reading Technical Memorandum: Ballona Wetlands Ecological Reserve Vegetation Alliance and Habitat Crosswalk

Santa Monica Beach Restoration Pilot Project – Year 1 Report

This report summarizes activities for the Santa Monica Beach Restoration Pilot Project from the time period December 2015 through August 2017. During this time period, the restoration was implemented in two phases over the course of two weeks including the installation of fencing and seeding of native coastal strand vegetation species. The first eight months… Continue reading Santa Monica Beach Restoration Pilot Project – Year 1 Report